[Construction Case] Installation Work of Combined Treatment Sewage System
Changed to a construction method that creates a large pit! Quick soil retention is adopted for the installation of a large combined sewage treatment tank!
This is an example of a private construction project that involves renovating a property acquired from public housing into a company dormitory. The initial design called for open excavation without soil retention, but it was deemed impractical due to the proximity of buildings. Therefore, "Quick Soil Retention BOX-type Panels" along with "Vertical Beam Connection Fittings" and "Long Support" were used. The construction method was changed to create a large pit, measuring 7.5m in length, 3.5m in width, and 3.5m in depth, using 350mm square H-beams for belly support. 【Equipment Used】 ■ Long Support ■ Quick Soil Retention (BOX type) ■ Vertical Beam Connection Fittings *For more details, please refer to the PDF document or feel free to contact us.